Open Internet by MindsNet
Managing Material Discontinuation in Existing Products
A supplier has discontinued a resin grade used in an existing product, and the replacement material has different processing characteristics. This requires revalidation of the new material, which may not be fully budgeted. The challenge is to find a way to determine if the replacement material is equivalent without re-running the entire test program.
Engineering, Core Engineering, Electrical Engineering